Skip to content

LKH Feldkirch Reconstruction East outdoor area

Facts and Figures
Company Nägele Hoch- und Tiefbau GmbH
Principal Vorarlberger Krankenhausbetriebsges. mbH
Location Feldkirch - Austria
Type Outdoor facilities
Runtime 09.2021 - 01.2023

Comprehensive civil engineering works at LKH Feldkirch

The outdoor facilities of the LKH Feldkirch main entrance east were completed at the beginning of 2023 and represented a versatile construction site. Among other things, approx. 70m of prefabricated concrete benches were moved, 700m² of coloured asphalt was laid and 150m of drainage pipes were dug and laid. The realisation of this work was challenging,

as a tight schedule had to be adhered to and close cooperation with other companies and trades was required. Ensuring access to the hospital for emergencies was always a particular priority. Despite these challenges, the project was successfully completed.